County Hall Norwich

A 12 storey tower that’s had a major refurbishment

The Challenge

County Hall in Norwich, a 12-story office tower that serves as the headquarters for Norfolk County Council, underwent major refurbishment as part of a £33 million project. The challenge was to refit 28 toilet areas throughout the building, alongside the installation of ducting to the kitchens on all floors. The project needed to deliver high-quality washroom facilities while ensuring durability and design that matched the modern upgrades throughout the building.

The Solution

To meet the needs of the refurbishment, we supplied Challenger Cubicles for the toilet areas. Known for their stylish design and durability, the Challenger Cubicles were paired with pre-framed ducts and vanity units, ensuring a robust, functional, and visually appealing solution. Additionally, pre-framed ducting was installed to the kitchens, maintaining consistency and efficiency across the entire office building.

The Outcome

The newly refurbished toilet areas and kitchen ducting at County Hall now meet the high standards required for the building’s modernized facilities. The combination of Challenger Cubicles, pre-framed ducts, and vanity units provides a stylish yet durable solution, contributing to the overall success of the £33 million refurbishment project. The facilities are now more functional, attractive, and aligned with the building’s overall upgrades.

You might also be interested in...

Challenger WELL NEXT SEA

Challenger

IPS Panelling

IPS Duct Panels

Semi recessed basins

Vanity Units and Wash Troughs

How Can We Help?

Our team is here to help you every step of the way, from initial consultation and planning through to design and production.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.